Eastbound working through the cut at Washington, MA on 6 February 1977 with an SW1500 on the point followed by three GP9s. Power lashup was one of the more peculiar arrangements seen in the early Conrail period.
Photo By
Year
Original Date
2/6/77
Location City
Location Details
CR Boston Line
Additional Galleries
Line or Locale
Collection