Southbound empties with CR 6119/CR 6756/CR 6038/CR 6027 have just cleared Landover Interlocking on the NEC near Cheverly, Md on 11/12/95.
Their day started at Chalk Point, Md on the Herbert Secondary and after running about 25 miles of the Popes Creek Secondary, they are about 4 miles from the end of their trip to Benning Yard in Washington, DC.
Photo By
Year
Original Date
11/12/95
Location City
Location Details
Landover
Equipment Type
Conrail Number
Additional Galleries
Line or Locale
Collection