Photo By
SEWA-9 proceeds south across the timber trestle on the restored track one side @ Inoa Island. The track was swung over to facilitate the contruction of a new concrete bridge on the track two side.
Year
Original Date
12/29/78
Location
Location Details
River Line
Equipment Type
Predecessor Paint Scheme
Additional Galleries
Line or Locale
Collection