Conrail C40-8Ws 6167 and 6166 appear to be making their first trip east after being delivered by GE. Both units show as being built in the prior month, February 1993. The duo is assisted by older Conrail power in bringing CGAL into Allentown Yard, passing through the interlocking at CP ALLEN.
Photo By
Year
Original Date
3/23/93
Location City
Location Details
CP Allen
Equipment Type
Additional Galleries
Line or Locale
Collection