Photo By
CR 5065 leads a westbound freight past the quarry. This was the era that the Pittsburgh Line was being reduced from a three track main to two tracks as the end of Track 1 can be seen beyond remnants of the former crossing.
Year
Original Date
6/19/91
Location
Equipment Type
Conrail Number
Additional Galleries
Line or Locale
Collection