With 6 months until retirement, GG-1 4882 waits for assignment at South
Amboy, NJ in April, 1983. Along with 4877 and 4879, 4882 would remain as
one of the last three operable GG1's available for the last revenue run
on October 28, 1983, and for the Farewell to the GG1 celebration on
October 29, 1983.
Photo By
Year
Original Date
4/3/83
Location City
Location Details
South Amboy engine terminal
Equipment Type
Conrail Number
Subject(s)
Line or Locale
Collection