Photo By
A Westbound CR freight is working hard as it blasts around the curve at the East end of the Portage Bridge. There was no 10mph slow order in effect at this time for trains crossing the bridge. A moment after this photo was taken the train passed thru the spring switch, which was the West end of double track, and roared out across the Portage Bridge.
Year
Original Date
6/5/77
Location
Location Details
Portage Bridge
Equipment Type
Conrail Number
Predecessor Paint Scheme
Additional Galleries
Line or Locale
Collection