Photo By
Former PC GP40 3040 leads leased CN GP38-2 5581 and CR U25B 2571 (ex-EL 2502) by the Juniata shops deadline on their way to Conway in August, 1977.
The next day at the Conway engine terminal, both CN 5581 and U25B 2571 were mixed with other CR power, ready for another assignment.
Year
Original Date
8/7/77
Location
Location Details
Juniata shops deadline
Conrail Number
Predecessor Paint Scheme
Subject(s)
Collection